    This process implementation package provides comprehensive up-to-date guidance on AEPC's implementation procedures for subsidy-supported solar grid-connected systems in Nepal. It outlines briefly the system design and related policies while referencing all relevant templates. The guiding document titled "00 AEPC GIZ 2024 • Implementation process guideline - Solar grid-connected" includes a flowchart of implementation procedures and describes supporting documentation required in each step (forms, report templates and checklists). The following supporting documents are included in the package:

    Step 1 Demand Collection and Pre-Feasibility
    01 Call notice - Nepali
    02 Leaflet - English

    03 Demand PFS Form - English
    04 Demand-PFS due-dilligence checklist – English

    Step 2 Detailed Feasibility Study
    05 DFS survey form - English
    06 DFS report template - English
    07 DFS due-diligence - English

    Step 3 Procurement
    08 Letter of intent - English
    09 Checklist for loan documents - English
    10 Agreement template for CAPEX - English
    11 RfP template for CAPEX-OPEX business models – English

    Step 4 Construction
    12 Construction supervision checklist - English
    13 Installation checklist - English
    14 Correction punchlist - English
    15 User manual & troubleshooting template - English
    16 Preventive maintenance form - English
    17 Testing commissioning - English
    18 Project completion report - English

    Date: 3 Chaitra 2080  - Published by: AEPC and GIZ
  • Thumbnail

    This process implementation package provides comprehensive up-to-date guidance on AEPC's implementation procedures for subsidy-supported solar grid-connected systems in Nepal. It outlines briefly the system design and related policies while referencing all relevant templates. The guiding document titled "00 AEPC GIZ 2024 • Implementation process guideline - Solar grid-connected (NP)" includes a flowchart of implementation procedures and describes supporting documentation required in each step (forms, report templates and checklists). The following supporting documents are included in the package:

    Step 1 Demand Collection and Pre-Feasibility
    01 Call notice - Nepali
    02 Leaflet - Nepali

    03 Demand PFS Form - Nepali
    04 Demand-PFS due-dilligence checklist – English

    Step 2 Detailed Feasibility Study
    05 DFS survey form - English
    06 DFS report template - English
    07 DFS due-diligence - English

    Step 3 Procurement
    08 Letter of intent - Nepali
    09 Checklist for loan documents - English
    10 Agreement template for CAPEX - English
    11 RfP template for CAPEX-OPEX business models – English

    Step 4 Construction
    12 Construction supervision checklist - Nepali
    13 Installation checklist - Nepali
    14 Correction punchlist - Nepali
    15 User manual & troubleshooting template - Nepali
    16 Preventive maintenance form - Nepali
    17 Testing commissioning - English
    18 Project completion report - English

     

    Date: 2 Chaitra 2080  - Published by: AEPC and GIZ
  • Thumbnail
    This Nepali version of the guideline for promotion, planning, and development of grid-connected solar PV systems seeks to assist provincial and local governments, owners of residential buildings, owners of commercial and industrial (C&I) establishments across Nepal in planning and developing grid-connected solar PV systems. Annex 15 is an Excel-based financial analysis tool which aids users in conducting financial analysis of grid-connected solar PV systems.
    Date: 1 Chaitra 2080  - Published by: AEPC and GIZ
  • Thumbnail
      This Nepali version of the guideline for promotion, planning, and development of grid-connected solar PV systems seeks to assist provincial and local governments, owners of residential buildings, owners of commercial and industrial (C&I) establishments across Nepal in planning and developing grid-connected solar PV systems. Annex 15 is an Excel-based financial analysis tool which aids users in conducting financial analysis of grid-connected solar PV systems.
    Date: 30 Falgun 2080  - Published by: AEPC and GIZ
  • Thumbnail
    The Excel tool serves as a basic sizing tool to estimate the key on-grid solar PV system component sizes and system costs.
    Date: 28 Falgun 2080  - Published by: AEPC and GIZ