    This process implementation package provides comprehensive up-to-date guidance on AEPC's implementation procedures for subsidy-supported solar mini-grids in Nepal. It outlines briefly the system design and related policies while referencing all relevant templates. The guiding document titled "00 AEPC GIZ 2023 • Implementation process guideline - Solar mini-grids" includes a flowchart of implementation procedures and describes supporting documentation required in each step (forms, report templates and checklists). The following supporting documents are included in the package:

    Step 1 Demand Collection and Pre-Feasibility
    01 Call notice - Nepali
    02 Leaflet - English
    03 Demand Form - English
    04 Recommendation for land and equity - English
    05 Letter ensuring for no-grid extension - English
    06 Demand-PFS due-dilligence checklist - English

    Step 2 Detailed Feasibility Study
    07A DFS survey form - English
    07B E&S form - English
    08 DFS report template - English
    09 DFS due-diligence – English

    Step 3 Procurement
    10 TRC Checklist - English
    11 PG-LG Agreement template - Nepali
    12 Format for tender evaluation – English

    Step 4 Construction
    13 Site verification report - English
    14 Construction supervision checklist - English
    15 Installation checklist - English
    16 Correction punchlist - English
    17 User manual for O&M  template - English
    18 Preventive maintenance form - English
    19 Testing and commissioning - English
    20 Project completion report - English
    21 Individual service center O&M agreement template – English

    Step 5 Handover
    22 Handover checklist - English
    23 Handover certificate - English

    Date: 2 Ashoj 2081  - Published by: AEPC and GIZ
    Category: Process implementation
  • Thumbnail

    This process implementation package provides comprehensive up-to-date guidance on AEPC's implementation procedures for subsidy-supported solar mini-grids in Nepal. It outlines briefly the system design and related policies while referencing all relevant templates. The guiding document titled "00 AEPC GIZ 2024 • Implementation process guideline - Solar mini-grids (NP)" includes a flowchart of implementation procedures and describes supporting documentation required in each step (forms, report templates and checklists). The following supporting documents are included in the package:

    Step 1 Demand Collection and Pre-Feasibility
    01 Call notice - Nepali
    02 Leaflet - Nepali
    03 Demand Form - Nepali
    04 Recommendation for land and equity - Nepali
    05 Letter ensuring for no-grid extension - Nepali
    06 Demand-PFS due-diligence checklist - English

    Step 2 Detailed Feasibility Study
    07A DFS survey form - English
    07B E&S form - English
    08 DFS report template - English
    09 DFS due-diligence – English

    Step 3 Procurement
    10 TRC Checklist - English
    11 PG-LG Agreement template - Nepali
    12 Format for tender evaluation – English

    Step 4 Construction
    13 Site verification report - English
    14 Construction supervision checklist - Nepali
    15 Installation checklist - Nepali
    16 Correction punchlist - Nepali
    17 User manual for O&M  template - Nepali
    18 Preventive maintenance form - Nepali
    19 Testing and commissioning - English
    20 Project completion report - English
    21 Individual service centre O&M agreement template – Nepali

    Step 5 Handover
    22 Handover checklist - Nepali
    23 Handover certificate - Nepali

    Date: 1 Ashoj 2081  - Published by: AEPC and GIZ
    Category: Process implementation
  • Thumbnail
    Letter confirming financial contribution and land availability for construction.
    Date: 15 Bhadra 2080
  • Thumbnail
    This form can be used to assess the feasibility of installing solar or hybrid mini grids in communities by collecting detailed information on location, current energy sources, community demographics, and potential commercial and public service centers. Its goal is to evaluate the community's readiness and ability to support the project, including their willingness to provide land, financial contributions, and ongoing maintenance.
    Date: 12 Poush 2079  - Published by: AEPC
    Category: Other Forms & Formats
  • Thumbnail
    Solar Mini-Grid PFS form
    Date: 12 Poush 2079  - Published by: AEPC
    Category: Other Forms & Formats
  • Thumbnail
    Template for Submission of Proposal for Construction Installation Upgradation Interconnection of Mini-Grid
    Date: 12 Shrawan 2079  - Published by: AEPC
    Category: Other Forms & Formats